Terminal Fit Out

This complete renovation to an operating trucking terminal in Phoenixville, PA consisted of demolition to present areas and renovations to two trucking bays, office areas, dispatch area, bathrooms, locker room, conference/meeting area and loading docks. McBRICK installed up-to-date materials such as waterless urinals, LED lighting, and Quartz flooring. Phasing was required and the project was successfully completed ahead of the 16 week proposed construction schedule.

All Projects